SERVICES AND SOLUTIONS

605_69e4f5ef41.png

Our procedure in brief

  1. Fulfillment of demand

  2. Conclusion of a work contract

  3. Creation of project documentation and settlement of the subsidy

  4. Installation and revision of the power plant

  5. Handling pre-launch administration

  6. Production of own electricity

Detailed description of individual works

  1. Processing the request​

We prepare an exact tailor-made offer based on a detailed technical description of your roof (dimensions, slope, type of roofing, etc.), household energy consumption for electricity, etc. Just contact us and we will ask you everything you need. The result of the initial step is the design of a photovoltaic power plant directly for your house. Among other things, we can also directly submit a power reservation request to your electricity distributor.​

687.jpg
691 (1).jpg

2. Work contract 

After the design of your power plant is approved, the work contract is concluded. The contract specifies in detail important dates, exact prices, defines warranty conditions, defines the mutual responsibilities of both parties, etc. At this stage, we will also sign power of attorney forms with you so that we can handle the necessary administration for you.

693.jpg
691 (1).jpg

3. Settlement of subsidy

After we have a power of attorney and a signed contract, we start handling the subsidy and the necessary part of the initial administration. There is a lot of paperwork associated with the realization of the power plant, but we will do everything necessary for you. This includes, for example, consent to connect to the distribution network, the factory's questionnaire for EGD, etc. It goes without saying that the subsidy application is also processed.

694.jpg
693 (1).jpg

4. Power plant installation

The administrative and project part is followed by the installation of the power plant and its revision. The installation is carried out by our technicians at a pre-arranged date. After the start-up of the power plant, we will carry out a professional electrical inspection. Everything is in test operation.

696.jpg
697.jpg

5. Administration

The final administrative part follows the commissioning of the power plant. Due to heavy traffic, it is necessary to deliver additional documents and applications to the relevant authorities. E.g. settlement of the Contract with the distribution company, Application for the granting of a license to the Energy Regulatory Office, submission of the inspection report of the electrical equipment, extract from the criminal record to the authorities, etc. Of course, we will take care of everything.

698.jpg
688.jpg

6. Own production

The final administrative part follows the commissioning of the power plant. Due to heavy traffic, it is necessary to deliver additional documents and applications to the relevant authorities. E.g. settlement of the Contract with the distribution company, Application for the granting of a license to the Energy Regulatory Office, submission of the inspection report of the electrical equipment, extract from the criminal record to the authorities, etc. Of course, we will take care of everything.

689.jpg
690.jpg

Solution

The design of a photovoltaic power plant can take many forms. In addition to local conditions and the orientation of the house, the investor's requirements and priorities also matter. He may want a quick return on investment or its maximum performance. What do customers choose most often?

BAJNOK

 START 1

  • powers one phase

  • lowest investment

Your investment: from 99,000 CZK including VAT.

BAJNOK START

3

  • for houses with high consumption

  • maximum performance to obtain a subsidy

Your investment: from CZK 139,000 including VAT

BATTERY BAJNOK IDEAL

  • deposit in case of power outage current

  • to obtain the maximum amount from the subsidy

Your investment: from 259,000 CZK including VAT

BATTERY BAJNOK MAX

  • for houses with high consumption

  • maximum performance to obtain a subsidy

Your investment: from CZK 339,000 including VAT